Protective design is one of the few areas of building engineering where the consequences of getting it wrong are measured in lives, and where most owners have no basis for judging quality. A glazing retrofit, safe room or facility siting study is only as good as the people who assess the risk, design the measures and verify the installation. This buyer's guide explains who does what on a protective design project, which credentials matter, what to ask in interviews, and the red flags that should end a conversation.

Soldiers beside a tall earth-filled protective barrier wall
Soldiers beside a tall earth-filled protective barrier wall

Key takeaways

  • Design work must be performed or supervised by an engineer licensed in the project's state, and some states require a separate structural engineering license for certain buildings.
  • Look for direct experience with the standards that apply to you: UFC, ISC, ASCE/SEI 59, API RP 752/753, or FEMA P-361 and ICC 500.
  • Select on qualifications and relevant experience first, then negotiate fee and scope.
  • Be wary of anyone who guarantees "blast-proof" results or sells a product before assessing your building.

Who does what on a protective design project

Larger projects usually involve a small team. Knowing the roles helps you ask the right firm the right questions.

RoleTypical responsibilitiesCredentials to look for
Security consultant or risk assessorRisk and vulnerability assessment, setting protection objectives, operational measuresProfessional security certifications such as ASIS PSP or CPP; experience with ISC or sector methods
Protective design structural engineerAnalysis and design of structure, walls, roofs and connections for extreme loads; progressive collapse evaluationPE or SE license in the project state; documented protective design experience
Glazing or facade consultantSpecifying glazing systems, frames, anchorage and retrofit products; reviewing test reportsFacade engineering experience; familiarity with ASTM F1642/F2912 and impact standards
MEP and fire protection engineersHVAC shutdown and filtration, emergency power, mass notification, fire protectionPE license; experience with critical facilities
Process safety specialist (industrial sites)Hazard scenarios and consequence or risk analysis for building sitingProcess safety experience under OSHA PSM and API RP 752/753
Special inspector or testing agencyVerifying installation, coatings, anchors and assemblies match the designAccredited inspection or testing credentials

Credentials that matter

Professional licensure

Engineering design for buildings must be sealed by a professional engineer licensed in the state where the project is built. Licensing exams for the Professional Engineer (PE) and Structural Engineer (SE) credentials are developed by NCEES, while each state's licensing board issues and disciplines licenses. Some states, such as Illinois, require a separate structural engineering license for certain structures. Verify any license directly on the state board's online lookup.

Security certifications

For risk assessment and security planning roles, ASIS International offers the Physical Security Professional (PSP) and Certified Protection Professional (CPP) certifications. These are not engineering licenses, but they indicate recognized knowledge of physical security assessment and practice.

Relevant experience

Credentials establish a baseline; experience with your specific framework is what separates firms. A federal civilian project needs familiarity with the ISC standards; a DoD project needs UFC experience; a refinery needs API RP 752/753 experience; a school safe room needs ICC 500 and FEMA P-361 experience. Our guide to protective design standards explains each framework so you can match it to the firm's track record.

A selection process that works

  1. Define the need. Write a one-page description of the building, occupancy, the concern (for example glazing hazards, siting, safe room, natural hazards) and any required standard. Do not include sensitive vulnerability details at this stage.
  2. Build a shortlist. Ask peers in your sector, your insurer and industry associations for referrals. Look for firms that publish technical papers or present at professional conferences on protective design.
  3. Request statements of qualifications. Ask for relevant projects, the specific people who would work on yours, their licenses and their roles on past projects.
  4. Interview. Meet the actual project engineer, not just a business development lead. Use the questions below.
  5. Select on qualifications. Federal agencies select architects and engineers on qualifications under the Brooks Act before negotiating fees, and many states follow similar rules. Private owners benefit from the same approach.
  6. Agree on scope and deliverables. Define the assessment, design, specifications, submittal review and construction-phase services in writing.
  7. Set information-handling rules. Agree how sensitive reports and drawings will be marked, stored and shared.
Armored wheeled vehicle finished in a camouflage protective coating
Armored wheeled vehicle finished in a camouflage protective coating

Questions to ask in an interview

  • Which protective design standards have you designed to, and on what types of buildings?
  • Who will perform and who will seal the work, and in which states are they licensed?
  • How do you set protection objectives with the owner, and how do you document decisions to accept risk?
  • What analysis methods do you use for building response, and how do you validate them against test data?
  • How do you evaluate the existing frames, walls and anchorage, not just the product being added?
  • How do you review product test reports to confirm they match our configuration?
  • What construction-phase services do you provide: submittal review, site visits, inspection of attachment details?
  • How do you handle security-sensitive information within your firm?
  • Can you provide references from owners of similar facilities?
Red flags

Promises that a building or product will be "blast-proof" or "storm-proof." Product recommendations before anyone has looked at your building. Reluctance to name the licensed engineer of record. Test reports for a configuration that does not match yours. Offers to share other clients' vulnerability assessments as "examples."

Scoping common project types

Glazing retrofit

Scope should include a survey of existing glass, frames and anchorage; selection of an appropriate retrofit system; specifications that reference tested configurations; review of installer submittals; and inspection of installed attachment details. Our retrofit options comparison explains the systems you may be choosing between.

Storm safe room

For community safe rooms, the design professional should prepare documents to ICC 500 and, where FEMA funding or FEMA criteria apply, FEMA P-361, including the required special inspection program. For homes, a contractor following FEMA P-320 prescriptive plans or installing a verified prefabricated unit may be sufficient. See our safe room guide.

Industrial building siting

Expect a process safety specialist to develop hazard scenarios and a structural engineer to evaluate building response, with clear documentation of criteria and assumptions. Ask how the study will be updated through management of change.

Natural hazard resilience

Scope often combines structural evaluation (for example ASCE 41 for seismic), nonstructural anchorage, envelope and roof upgrades and backup power, as outlined in our critical infrastructure guide.

Protecting the information you generate

Risk assessments and protective design drawings describe how a building could be harmed and how it is protected. Treat them as sensitive. Limit distribution to people who need them, include confidentiality terms in contracts, mark documents clearly, and keep detailed findings out of public bid packages where possible by sharing them only with prequalified bidders. Federal projects have specific handling requirements, such as those for Controlled Unclassified Information.

Signs of a strong firm

  • Named, licensed engineers with relevant project history
  • Clear explanation of methods and limitations
  • Construction-phase involvement offered by default
  • Careful handling of sensitive information

Signs to keep looking

  • Generic answers that do not mention your standard
  • Fee-first conversations with vague scope
  • Ties to a single product line with no alternatives discussed
  • No interest in your existing building conditions

Frequently asked questions

Does a protective design engineer need a special license?

There is no separate protective design license. The work must be performed or supervised by a professional engineer licensed in the project state, and some states require a structural engineering license for certain structures. Specialized experience is what distinguishes qualified firms.

Can a window film installer design a blast retrofit?

Installers are essential for quality installation, but the protective design, including evaluation of frames, anchorage and walls and selection of tested configurations, should be led by a qualified engineer independent of any single product.

What is the Brooks Act?

It is the federal law requiring qualifications-based selection of architects and engineers for federal projects, with fees negotiated after the most qualified firm is selected. Many states have similar laws for public projects.

How should I share sensitive building information with bidders?

Share only what each party needs, require confidentiality agreements, mark documents and consider prequalifying bidders before releasing detailed protective design information.